Laserfiche WebLink
rCOLORADO LINING 10 0 '♦ �� <br /> INTERNATIONAL ®�X 101 <br /> Alt# Daily Installation Report <br /> Date: Friday,August 18,2017 <br /> Project: Idaho Springs Repair Job#6398 <br /> Owner: Patrick Maher <br /> Engineer: <br /> Contractor: Venture Resources Inc. <br /> Installation Supervisor: Randy Cosgrove <br /> Materials: 60 Mil HDT <br /> Pre-Weld Tests <br /> 7:35am 55 480 400 N/A 1227 180 R.G. 1763 P <br /> 119 177 P <br /> 224 181 P <br /> C ZZ 67 480 400 N/A 118 176 C.R. 1763 P <br /> 125 179 P <br /> 117 173 p <br /> Repairs-16 SF 2,040 Leister <br /> GCL-1,293 SF 70 Sun/W-10-15 NIA <br /> Extrusion-708' <br /> Comments: <br /> Left hotel @ 5:50,on site @ 7:00am. Loaded a roll of geo-composite in truck @ top,and unload @ bottom. <br /> Trial Weld,Pass! Liester R-21 on S.Side panel.Grind and Extrude R's-21-35. Leister All repairs.Off site @ <br /> 5:30pm, Hotel @ 6:35pm. <br />