2.02 EMBANKMENT MATERIALS SUMMARY <br /> Minimum <br /> Placement Minimum <br /> Construction Unified Soils Class and Testing Testing <br /> Zone Requirements Compaction Requirements Interval <br /> Requirements <br /> Embankment CL,SC,GC,GW-GC,GP-GC 95%of ASTM Density by nuclear Each 1,000 yds3 <br /> D698 gage,ASTM D698 (or 2 per day when <br /> soil is placed, <br /> whichever is <br /> larger) <br /> Sieve analysis,ASTM Each 10,000 yds3 <br /> D422 <br /> Atterberg limits, Each 10,000 yds3 <br /> ASTM D4318 <br /> Pit Run Fill GW,GP,GM,SW,SP,SM Performance Density by nuclear Each 1,000 yds3 <br /> Specification gage,ASTM D698 (or 2 per day when <br /> soil is placed, <br /> whichever is <br /> larger) <br /> Sieve analysis,ASTM Each 5,000 yds3 <br /> D422 <br /> PART 3-EXECUTION <br /> 3.01 GENERAL <br /> No material shall be placed in any portion of the embankment until the foundation for each section has been <br /> stripped,suitably prepared,and has been approved by the Engineer. A foundation check sheet shall be signed <br /> by the Contractor and Engineer before soil placement. <br /> All cavities,depressions and irregularities,within the area to be covered by embankment and which extend <br /> below or beyond the established lines of excavation for dam embankment foundations,shall be filled with <br /> embankment materials as specified for the overlying embankment. <br /> 3.02 STRIPPING <br /> The entire area to be occupied by the embankment shall be stripped to the depth shown on the Construction <br /> Drawings or to a sufficient depth,as determined by the Engineer,to remove all unsuitable materials. The <br /> unsuitable materials to be removed by stripping shall include all debris,topsoil,vegetable matter,including <br /> roots and all other perishable and objectionable materials that are unsuitable for use in permanent construction <br /> required under these Specifications or that might interfere with the proper bonding of the embankment with the <br /> foundation or the proper compaction of the materials in the embankment,or that may be otherwise <br /> objectionable as determined by the Engineer. If suitable,stripped material shall be stockpiled for future use as <br /> topsoil. <br /> 3.03 FOUNDATION PREPARATION <br /> The foundation shall be tested with density gauge and/or proofrolled as approved by the Engineer prior to <br /> placement of any soils. Prior to placement of the embankment,the entire foundation shall be stripped to a <br /> depth of 12",as shown on the Plans,and properly prepared. Locally,stripping may have to be deeper to reach <br /> a suitable subgrade. All loose materials shall be removed. The foundation shall be moisture conditioned and <br /> rolled with a sheepsfoot compactor prior to placement of the first lift of embankment soil. <br /> Section 02290-Page 2 of 4 February 2016 <br />