My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-19_REVISION - M2000041
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000041
>
2017-10-19_REVISION - M2000041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:07 PM
Creation date
10/20/2017 10:03:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
REVISION
Doc Date
10/19/2017
Doc Name Note
Requested Docs
Doc Name
Adequacy Review
From
Fremont Paving
To
DRMS
Type & Sequence
TR4
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2 - SITE WORK <br /> SECTION 02290-EMBANKMENT CONSTRUCTION <br /> PART1-GENERAL <br /> 1.01 WORK INCLUDED <br /> Construction of the embankment as shown on the Construction Drawings and as specified herein,including <br /> foundation preparation,dewatering,fill placement,moisture control,and compaction. <br /> 1.02 RELATED WORK <br /> A. Section 02100-Site Preparation <br /> B. Section 02140-Dewatering <br /> PART 2-MATERIALS <br /> 2.01 COMPACTED EMBANKMENT <br /> The embankment fill shall be constructed in accordance with the Construction Drawings. The majority of the <br /> embankments will be constructed with native soils. All embankment construction shall be in accordance with <br /> these Specifications. <br /> A. Embankment Fill <br /> Embankment Fill will be constructed of clayey soils meeting the following criteria: <br /> Sieve Size %Passing <br /> 8" 100 <br /> No.4 30-85 <br /> No.200 15-60 <br /> Minimum Plasticity Index of 8 <br /> The material shall be obtained from required excavations,borrow areas,stockpiles,or other sources as <br /> determined by the Contractor and approved by the Engineer. The soils shall be free of any deleterious <br /> materials,including materials larger than 8". It is anticipated that all borrow materials will be from <br /> the existing stockpiles and/or from the bottom of the existing mined cell. Clayey overburden soils <br /> do not require the use of a disc. If blending of dissimilar materials are used for embankment fill,such <br /> as clayey overburden soils and squeegee,a disc will be required on the fill as part of the soil <br /> placement procedures. <br /> B. Pit Run Fill <br /> Pit Run Fill will be constructed using free draining(i.e.less than 5%passing the No.200 sieve)native <br /> pit run soils excavated from the mine slopes as determined by the Contractor and approved by the <br /> Engineer. Moisture condition and compact pit run fill as necessary to construct a slope similar to the <br /> existing cut slopes at the mine. <br /> February 2016 Section 02290-Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.