Laserfiche WebLink
5. All three topsoil borrow areas (BA -1, BA -2 and BA -3) have been reclaimed. <br />BA -3 lies southwest of Pond 6. <br />6. NECC has field checked culvert and check -dam locations and has revised <br />Map 2.05.3-7 as necessary. <br />7. Map 2.05.3-7has been revised and updated to reference the ditches with <br />design standards as shown in Table 15-2 of Exhibit 15of the Lorencito <br />Canyon Mine permit. Ditch nomenclature has been revised to agree with <br />Exhibit 15. Operational ditches continue with field designated numeration <br />as assigned on the Map. <br />Please contact me with any questions, <br />Rear ds <br />Ron Thompson <br />Agent <br />Enclosures: <br />Map 2.05.3-7 (three certified copies) <br />Page 2.05-30 Repaginated) <br />Page 2.05-30a <br />