Laserfiche WebLink
\fi _ In <br /> Transit Mix Concrete Co. <br /> 2 was installed in July 2017 and measures flows conditions upstream from the proposed mining <br /> area. The LTC-2 station is located near the western boundary of the Ranch property, Figure G- <br /> 1. These stations collect stream depth data every 15 minutes using Solinst Level Loggers. Flow <br /> measurement data and water quality samples were collected quarterly at station LTC-1, and <br /> starting July 2017, both stations will be sampled monthly. A total of eight water quality sampling <br /> events have been conducted since LTC-1 was established, and these sampling events collected <br /> data from wet and dry seasons. LTC-2 has been sampled twice. These locations will continue to <br /> be monitored to establish baseline conditions as discussed in the attached Surface Water and <br /> Groundwater Monitoring Plan. Figure G-2A illustrates LTC-1 during the August 2015 visit, and <br /> Figure G-21B illustrates LTC-2 during the July 2017 visit. <br /> Hitch Rack Ranch Quarry Permit Application <br /> October 3,2017 G-5 <br />