Laserfiche WebLink
'1 Transit Mix Concrete Co. <br /> 0 ,Reclamation Quantities and Phasing <br /> Reclamation will occur contemporaneously as mining progresses and as areas become available for material placement and <br /> closure. Areas, estimated volumes of mined material and salvageable topsoil are shown on Table D-1 and Table D-2 in Exhibit D. <br /> Table E-1 Reclamation Areas by Affected Land Type <br /> Highwall Highwall Total Topsoil Fines Mining Total <br /> Pit Floor Backfill Mining Plant Roads , Related <br /> (acres) Bench Slope Stockpile Area (acres) (acres) Stockpile Stockpile Area Area <br /> (acres) (acres) acres (acres) (acres) (acres) (acres) <br /> Phase 1 0.00 0.00 0.00 0.00 0.00 0.00 20.57 0.00 0.00 0.00 20.57 <br /> Phase II 0.00 1.78 2.20 0.00 3.97 0.00 0.00 0.00 0.00 0.00 3.97 <br /> Phase III 0.00 0.00 0.00 7.95 7.95 0.00 0.00 0.77 10.58 0.00 18.54 <br /> Phase IV 0.00 0.00 0.00 2.77 2.77 0.00 0.00 0.00 0.00 0.00 2.77 <br /> Phase V 0.00 6.72 8.31 13.65 28.68 0.00 0.00 0.00 0.00 0.00 28.68 <br /> Phase VI 28.41 3.98 4.92 47.99 85.29 12.35 16.65 3.88 3.40 59.17 164.60 <br /> Total 28.41 11.53 14.27 73.71 128.66 12.35 37.22 4.66 13.98 59.17 239.03 <br /> ' The plant and topsoil stockpiles are wholly within the total mining and topsoil stockpile areas, and the reclamation areas associated with the <br /> plant and topsoil stockpiles are included in these other areas. <br /> Hitch Rack Ranch Quarry Permit Application <br /> October 3, 2017 E-4 <br />