Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> September 2017 Monthly Report <br /> Page 3 <br /> Table 2—September 2017 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> feet Water ft <br /> P10 9/28/17 57.55 58.30 0.75 <br /> PH 9/28/17 41.38 41.80 0.42 <br /> P12 9/28/17 41.68 41.71 0.03 <br /> P13 9/28/17 41.03 41.34 0.31 <br /> P14 9/28/17 41.21 41.24 0.03 <br /> P15 9/28/17 40.84 41.10 0.26 <br /> Table 3 below provides the calendar year 2017 sludge management for the San Luis site. <br /> Table 3 -Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management <br /> July 2016 104 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> Should you have any questions or comments,please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr. Larry Fiske at(303) 837-5676. <br /> inc�e`rely, <br /> �4l 4 <br /> J io F.Madrid <br /> S Supervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />