Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> September 2017 Monthly Report <br /> Page 2 <br /> Table I-September 2017 Ground Water Monitoring Well and Lysimeter Depth to Water <br /> Measurements <br /> Monitoring Site Date Depth to Water(feet) <br /> M-4R 9/28/17 0 <br /> M-6 9/28/17 Dry <br /> M-7 9/28/17 Dry <br /> M-8 9/28/17 Dry <br /> M-9 9/28/17 141.73 <br /> M-10 9/28/17 25.83 <br /> M-11 R 9/28/17 40.49 <br /> M-12 9/28/17 175.29 <br /> M-13R 9/28/17 126.14 <br /> M-14 9/28/17 131.30 <br /> M-15 9/28/17 92.04 <br /> M-16 9/28/17 23.15 <br /> M-19 9/28/17 23.85 <br /> M-21 9/28/17 17.95 <br /> M-22 9/28/17 16.67 <br /> M-26 9/28/17 15.69 <br /> M-32 9/28/17 50.07 <br /> M-33 9/28/17 48.65 <br /> M-34 9/28/17 23.63 <br /> BF-4 9/28/17 24.93 <br /> BF-6 9/28/17 30.94 <br /> LS-1R 9/28/17 Dry <br /> LS-2R 9/28/17 Dry <br /> LS-3 9/28/17 Dry <br /> LD-1R 9/28/17 Dry <br /> LD-2R 9/28/17 Dry <br /> LD-3 9/28/17 Dry <br /> Table 2—September 2017 Tailing Disposal Area Piezometer Depth to Water <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P6 9/28/17 Dry 72.46 0.00 <br /> P7 9/28/17 92.28 92.50 0.22 <br /> P8 9/28/17 96.52 97.51 0.99 <br /> P9 9/28/17 71.96 72.30 0.34 <br />