Laserfiche WebLink
Task description: <br />Site: Roadside Portals <br />MOTOR GRADER WORK <br />TR69 Topsoil replacement <br />Permit Action: RN7 Permit/Job#: C1981041 <br />PROJECT IDENTIFICATION <br />Task #: 215 <br />Date: 9/28/2017 <br />User: JHB <br />State: Colorado <br />County: Mesa <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Cost Breakdown: <br />Page 28 of 32 <br />Abbreviation: None <br />Filename: C041-215 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Total Fleet Cost/Hour: $139.83 <br />MATERIAL OUANTITIES <br />Total Area to be graded or ripped: 0.40 <br />Utilization % <br />Ownership Cost/flour: <br />$54.68 <br />NA <br />Operating Cost/Hour: <br />$46.99 <br />100 <br />Ripper Ownership Cost/Hour: <br />$0.00 <br />NA <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Selected Blade Angle: <br />Operator Cost/Hour: <br />$38.16 <br />NA <br />Total Unit Cost/Hour: <br />$139.83 <br />Width of blade overlap per pass: <br />Total Fleet Cost/Hour: $139.83 <br />MATERIAL OUANTITIES <br />Total Area to be graded or ripped: 0.40 <br />acres <br />Source of estimated acreage: TR69 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acresihour <br />Job Condition Correction Factors <br />Site Altitude: 5100 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />1.6527 <br />1.6527 <br />Total job time <br />acres/flour <br />acres/Hour <br />0.24 <br />Hours <br />Unit cost: $84.61 per acre Total job cost: $34 <br />CIRCES Cost Estimating Software <br />