Laserfiche WebLink
Rolling Resistance — Road Conditions <br />Haul: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Return: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul and Return Time <br />Length Grade Res. <br />Rolling Res. <br />Total Res. (%) <br />Travel Time <br />Source <br />(feet) (%) <br />(%) <br />(minutes) <br />Haul Route: 100 0.00 <br />3.00 <br />3.00 <br />0.0564 <br />(Cat HB) <br />Return Route: 100 0.00 <br />3.00 <br />3.00 <br />0.0564 <br />(Cat HB) <br />Load Bucket Capacity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Correction Factors <br />Site Altitude: 5100 feet <br />1.80 <br />1.100 <br />1.98 <br />Total Travel Time: <br />Total Cycle Time: <br />0.1128 <br />0.5028 <br />LCY (heaped) <br />Other - rock/dirt mixtures (100-120%) 1.100 <br />LCY <br />Source <br />Altitude Adj: 0.95 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.79 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) <br />Unit cost: $0.412 /LCY <br />236.28 LCY/Hour <br />186.30 LCY/Hour <br />186.30 LCY/Hour <br />minutes <br />minutes <br />Total job time: 1.74 Hours <br />Total job cost: $134 <br />