My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-28_REVISION - M1981185 (158)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-09-28_REVISION - M1981185 (158)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:07 PM
Creation date
10/4/2017 4:25:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Revision
Doc Date
9/28/2017
Doc Name Note
Part 3 of 12
Doc Name
Request For Amendment To Permit
From
Sunrise Mining, LLC
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Access Portal Collapse Repair and Equipment and Stope Rock Removal Work Plan <br />March 2, 2012 <br />May Day No. 1 <br />1.0 INTRODUCTION <br />proach to stabilizing and <br />This Work Plan presents Wildcat Mining Corporation's material approximdcaO ately 2,300 cubic yards) and <br />repairing the Access Portal, removal of collapsed mucker) at the mate (PP <br />buried equipment (jaw crusher, cone crusher and rock ortore from ll portal (within a st pe <br />removal of approximately 5,000 cubic yards of stockpiled <br />accessed by the May Day No. l Portal (Phase 2). The May Day Idaho <br />or do (Figure Complex is located <br />in La Plata County approximately 15 miles west of Durango, <br />n the Process of <br />Wildcat is proposing to operate the May Day ine Idaho M03674. Upon D activation,Complex and <br />0 and MSHA's <br />activating MSHA mine identification (ID) number <br />review and DBMS approval of this Work Plan, Wildcat will implement the corrective actions <br />described herein. <br />In April 2010, a collapse of the area surrounding s e Masmg the Ma portal <br />Day o.clurred. he a <br />collapse resulted in a cave in of two separate ad <br />historic access portal <br />the "Access Portal") and a load -out portal containing a mill (the "Mill <br />portal"). The May Day No. 1 Affected Area consists of a relatively flat pad, a mill and a main <br />access tunnel/adit (Photograph No. 1). The highwall above the collapsed portals is <br />with slopes inclined at approximately 0.5(H):1(V) (horizontal: <br />approximately 30 feet high p (Photograph No. 2 The fill slopes <br />vertical). Rock faces above the area are somewhat steeper ri120 0, a collapse blocked the <br />on the edges of the pad are approximately 1.5(H):l(V). P <br />the steel sets housing the mill in <br />first 15 to 20 feet of the Access Portal and the first 10 d an old landslide, which was nothe <br />Mill Portal (Photographs No. 3 and 4). The portals penetrate <br />accounted for in the original design or construction. Bedrock resistsforma ion shat theone of <br />mud <br />the Morrison Formation. It dips (east) into the highwall geologic <br />portals penetrate dip approximately 30 degrees away from the collapsed area. The collapse <br />appears be to the landslide/bedrock contact. <br />Following the collapse, MSHA issued an order (46445198) that prohibits all activity �n the <br />Day No. 1 Portal until MSHA has determined <br />hmt e t1D12 t is s safe amended Section operationsresume mining 12d permit <br />area. Wildcat submitted as Exhibit D, <br />application a Portal Collapse Repair Work Plan for the M = Day <br />f the collapse at both the A� ess <br />plan"). This Original Work Plan generally addressedp . Having agreement with the <br />Portal and the Mill Portal, but focused a at Howly on seeks to bihe furcated s approach to rehabilitation of <br />DBMS on the overall Work Plan, <br />the May Day No. l portal in order to better accommodate worker safety and the concerns of <br />' in its December 10, 2009 Order addressing Notice of Violation No. MV -2009-035, the Mined Land Reclamation <br />Board specifically addressed a proposal by Wilthat at t�The Operator iremove this s ordered t iled kcease and deor ore from si t from all e stope emining <br />y <br />the May Day No. 1 Portal, providing in part <br />related activities, we to <br />ith the exception 1of relocating 0 2009 Order, a02 cubic Wildcat now seeks in thof ore is Work Plan to remove same <br />the portal pad at Level 1 .... Dec. <br />5,000 cubic yards of rock or ore from the stope accessed by the May Day No. 1 Portal. <br />EnviroGroup Limited 1 <br />DEN 97,749,013x3 2-29-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.