Laserfiche WebLink
Access Portal Collapse Repair and Equipment and Stope Rock Removal Work Plan <br />March 2, 2012 <br />May Day No. i <br />TABLE OF CONTENTS <br />SECTION <br />PAGE NO. <br />3.0 CONSTRUCTION IMpLEMENATION PLAN <br />.............................................................. 7 <br />3.1 DOCUMENTATION AND CONSTRUCTION REPORTING ..........................••• 7 <br />3.2 QUALITY ASSURANCE AND QUALITY CONTROL PROGRAM ..............•.. 8 <br />3.3 PROJECT CLOSEOUT AT THE END OF PHASE 2 ACTIVITIES.................... <br />19 <br />3.4 POST-CONTRUCTION MONITORING PROGRAM ...............................•••.••• <br />3.5 <br />INSPECTION AND MAINTENANCE PROGRAM ........................................... 10 <br />4.0 RE............................................................................. 11 <br />List of Photographs <br />Photograph No. 1— May Day No. 1 Mine — Mill Portal Area (November 2009) <br />Photograph No. 2 — May Day No. 1 Mine — Access Portal Area Collapse <br />Photograph No. 3 — May Day No. 1 Mine — Portal Collapse at Mill Building Access <br />Photograph No. 4 — May Day No. 1 Mine — Collapse Within Access Portal <br />List of Figures <br />Figure 1— Total Operational Area Plan <br />Figure 2 — May Day No. 1 Mine Schematic Plan at Portal Area <br />Figure 3 — May Day No. 2 Stockpile Area <br />Figure 4 — Typical Adit Support Sections <br />Figure 5 — May Day No. 1 Boring Locations <br />EnviroGroup Limited <br />DEN 97,749,013x3 2-29-12 <br />1 <br />1.0 <br />INTRODUCTION.............................................................................................................. <br />2.0 <br />WORK PLAN...................................................................................................................... <br />4 <br />2.1 PRIOR INVESTIGATION............................................................................. <br />2.2 PHASE 1 SCOPE OF WORK: TASKS 1 -4 ........................................................... <br />5-7 <br />4 4 <br />2.3 PHASE 2 SCOPE OF WORK: TASKS ........................................................... <br />3.0 CONSTRUCTION IMpLEMENATION PLAN <br />.............................................................. 7 <br />3.1 DOCUMENTATION AND CONSTRUCTION REPORTING ..........................••• 7 <br />3.2 QUALITY ASSURANCE AND QUALITY CONTROL PROGRAM ..............•.. 8 <br />3.3 PROJECT CLOSEOUT AT THE END OF PHASE 2 ACTIVITIES.................... <br />19 <br />3.4 POST-CONTRUCTION MONITORING PROGRAM ...............................•••.••• <br />3.5 <br />INSPECTION AND MAINTENANCE PROGRAM ........................................... 10 <br />4.0 RE............................................................................. 11 <br />List of Photographs <br />Photograph No. 1— May Day No. 1 Mine — Mill Portal Area (November 2009) <br />Photograph No. 2 — May Day No. 1 Mine — Access Portal Area Collapse <br />Photograph No. 3 — May Day No. 1 Mine — Portal Collapse at Mill Building Access <br />Photograph No. 4 — May Day No. 1 Mine — Collapse Within Access Portal <br />List of Figures <br />Figure 1— Total Operational Area Plan <br />Figure 2 — May Day No. 1 Mine Schematic Plan at Portal Area <br />Figure 3 — May Day No. 2 Stockpile Area <br />Figure 4 — Typical Adit Support Sections <br />Figure 5 — May Day No. 1 Boring Locations <br />EnviroGroup Limited <br />DEN 97,749,013x3 2-29-12 <br />