My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-28_REVISION - M1981185 (158)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-09-28_REVISION - M1981185 (158)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:07 PM
Creation date
10/4/2017 4:25:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Revision
Doc Date
9/28/2017
Doc Name Note
Part 3 of 12
Doc Name
Request For Amendment To Permit
From
Sunrise Mining, LLC
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Access Portal Collapse Repair and Equipment and Stope Rock Removal Work Plan <br />March 2, 2012 <br />May Day No. 1 <br />the May Day No. 1 adit. The samples will be tested for environmental, mining and processing <br />purposes. <br />2.3 Phase 2 Scope of Work: Tasks 5 - 7 <br />Phase 2 construction activities will be completed following submittal of a second work plan and <br />engineering design for DBMS review and approval. The design will include as -built conditions <br />from Phase 1 activities. <br />A geological engineering assessment of current conditions following the Phase 1 work will be <br />performed and will include the following components: <br />• Mitigation of conditions that may affect the final stability of the highwall above the <br />portal; <br />• Mitigation of conditions that led to portal collapse; and, <br />• Corrective action plan. <br />Geotechnical information will be provided in the Phase 2 design including the following: <br />• Existing bench test boring logs, which were drilled in January 2012 on the May Day No. <br />1 bench (Figure 5); and, <br />• Laboratory tests including moisture content, dry density, strength, classification, grain - <br />size distribution, and compaction. These laboratory tests are currently underway and will <br />be reported in the Phase 2 design document. <br />The Phase 2 design will include the necessary components required for long-term stabilization of <br />the May Day No. 1 Portal area. This will facilitate rehabilitation of the adit, as necessary, to <br />achieve safe access to the stope located approximately 800 to 1,000 feet within the alit. <br />from the stope accessed by the May Day No. 1 Portal will be <br />Removal and testing of rock/ore <br />performed as described in Section 1.0 above, or in accordance with the DBMS -approved Phase 2 <br />design. Wildcat anticipates that the design will be completed for submittal to the DRMS within <br />2 to 3 weeks following the completion of Phase 1 activities. <br />EnviroGroup Limited <br />DEN 97,749,0130 2-29-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.