Laserfiche WebLink
MAY DAY IDAHO MINE COMPLEX <br />M -1981-185,112d-2 AMENDMENT (AM -2) APPLICATION <br />SUNRISE MINING, LLC <br />Figures <br />Figure D=1— Total Operational Area <br />Figure D-2 — Geologic Block Model Mine Development <br />Figure D-3 — Base of Operations <br />Figure D-4 — Ore Stockpiles <br />Figure D-5 — Access Road Base of Operations <br />Figure D-6 — May Day No. 1 Mine Site <br />Figure D-7 — May Day No. 2 — Temporary Ore Stockpile <br />Figure D-8 — May Day No. 2 Mine Site <br />Figure D-9 — Stormwater Management Structures <br />Figure D-10 — Chief Portal Mine Site <br />Figure D-11— Pay Day Idaho Mine Site <br />Figure D-12 a — Access Road Grading Profile — Affected Area <br />Figure D-12 b — Access Road Grading Profile — Affected Area <br />10 <br />