My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-10-02_INSPECTION - C1982057
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982057
>
2017-10-02_INSPECTION - C1982057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2017 12:37:30 PM
Creation date
10/2/2017 12:19:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Inspection
Doc Date
10/2/2017
Doc Name
Inspection Report
From
DRMS
To
Seneca Property, LLC
Inspection Date
9/18/2017
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 18, 2017 C-1982-057/Seneca II-W Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 2 <br />Number of Complete Inspections this Fiscal Year: 1 <br /> <br /> Page 3 of 7 <br /> <br /> <br />- The primary riser pipe remains damaged. The pipe has rusted through to allow water to enter the pipe <br />approximately 2 feet below the top of the riser. A small amount of initial erosion has begun around the pipe and <br />into the embankment. In order to ensure compliance and prevent damage to the embankment, this riser pipe will <br />require repair. Miranda Kawcak of Seneca Property stated that it is the intention of the operator to attempt to <br />place a sleeve over the pipe as access to the site with heavy equipment is difficult. The repair material has been <br />ordered and should be repaired prior to the October inspection and before winter. <br /> <br />Pond 016 embankments were stable and well vegetated. The pond was discharging at the time of the inspection. <br />No problems were noted with the primary or emergency spillways. <br /> <br />Pond 005 was holding water with no discharge. The embankments were stable with no problems noted. Two salt <br />blocks are on the north end of the embankment. <br /> <br />Pond 017 was not discharging at the time of the inspection. The pond embankments were stable with no problems <br />noted to the primary and emergency spillways. <br /> <br />Stock Tanks observed throughout the site were holding water and stable. Permanent drainages were stable with no <br />problems noted. <br /> Pond 015 Pond 006
The URL can be used to link to this page
Your browser does not support the video tag.