Laserfiche WebLink
The road adjacent to the stormwater collection ditch will be used by the landowner to access <br /> the river front. <br /> 5. If roads will remain on the mine site following reclamation,then they must be depicted on a <br /> revised Reclamation Plan Map. Please submit a revised Reclamation Plan Map which depicts <br /> all roads which will remain following reclamation as required by Rule 6.4.6 <br /> See the revised Map F-1. <br /> 6. The Applicant has indicated the total active non-sediment pond area is—1.3 acres. Please <br /> specify what methods were used to determine the size of the active non-sediment pond area <br /> and provide any available data to support the findings. <br /> Aerial survey data acquired in July 2017 was used to delineate and measure the area of the <br /> non-sediment ponds on site. This aerial data is reflected in the contours and pond areas shown <br /> on Map C-2 <br /> Please contact me if you have any further questions or concerns. <br /> Sincerely, <br /> Ben Langenfeld, P.E. <br /> Greg Lewicki and Associates <br /> Gloria Z Pit 2 6nZ Irw t4i aA.l 1sH_ ..11 <br />