My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-09-22_GENERAL DOCUMENTS - M2001005
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M2001005
>
2017-09-22_GENERAL DOCUMENTS - M2001005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 9:27:46 AM
Creation date
9/25/2017 3:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001005
IBM Index Class Name
General Documents
Doc Date
9/22/2017
Doc Name
Request to Import Fill
From
Transit Mix Concrete
To
DRMS
Email Name
ERR
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e. "an explanation of how the backfilled site will result in a post-mining <br /> configuration that is compatible with the approved post-mining land use; and <br /> Imported fill will aid in achieving the approved post mining topography and in <br /> bringing all site elevations, exterior to the basin created for Pond Two,to at least two <br /> feet above the prevailing ground water elevation. No waste concrete will be disposed <br /> at the site. <br /> f. "a general engineering plan stating how the material will be placed and <br /> stabilized in a manner to avoid unacceptable settling and voids. <br /> As currently approved, the post mining slopes will be 3H:1 V or less with a maximum <br /> pond depth of 20 feet. <br /> Placement of imported waste construction material on flat areas of the pit is intended <br /> to raise the final topography to at least two feet above the prevailing ground water <br /> elevation. The level or flat areas where imported construction waste may be placed <br /> will not be compacted. This final layer of material will act as part of the plant growth <br /> material and it will be seeded. It will therefore be managed as subsoil for placement <br /> of topsoil. <br /> Imported construction waste material intended to aid in achieving the final 3H:IV <br /> slopes for the final Pond Two configuration will be graded in conformance with the <br /> already approved reclamation plan. In other words, it will be no different than <br /> placement of existing stockpiled overburden, intended for final reclamation. <br /> Therefore, all imported construction waste material should result in stable <br /> configurations. <br /> Respectfully, <br /> Mr. Brandon Heser <br /> Production Manager <br /> Transit Mix Concrete Co. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.