My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-24_REPORT - C2009087
DRMS
>
Day Forward
>
Report
>
Coal
>
C2009087
>
2017-08-24_REPORT - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 10:38:36 AM
Creation date
8/25/2017 8:52:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Report
Doc Date
8/24/2017
Doc Name
Annual Hydrology Report Adequacy Review
From
DRMS
To
Peabody Sage Creek Mining, LLC
Annual Report Year
2016
Permit Index Doc Type
Hydrology Report
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 <br />Requirement Regulation Comment <br />15. Content of pond reports <br /> <br />CDRMS regulation <br />4.05.9(15) <br /> <br />The annual impoundment inspection reports are <br />required to include the information required by Rule <br />4.05.9(15). The report forms for each impoundment <br />includes a checklist regarding erosion, instability, <br />structural weaknesses and items that may be <br />considered hazardous. Spillway and decant systems <br />are inspected, however the monitoring <br />instrumentation (flumes/weirs) are not discussed. <br />Other aspects affecting structural stability and items <br />that may require maintenance are discussed. <br /> <br />For all of the impoundments, in accordance with <br />Rule 4.05.9(15), the report is required to discuss : <br /> <br />b) Existing and required monitoring procedures and <br />instrumentation. <br />c) The depth and elevation of any impounded waters <br />at the time of the certified report. <br />e) Existing storage capacity of the impoundment. <br /> <br /> The inspection report forms for the <br />impoundments do not supply this required <br />information. For the next quarterly <br />impoundment inspection report required <br />by Rule 4.05.9(17), please supply the <br />information cited above. <br />16. Sampling frequency of <br />ground water monitoring wells <br /> <br />Volume 1, p. 2.04-104 <br />of CDRMS mining <br />permit C-2009-087 <br /> <br />The permitted sampling frequency was in compliance <br />at all ground water monitoring sites. <br /> <br /> <br />17. Parameters to be analyzed <br />in ground water samples <br /> <br />Volume 1, p. 2.04-105 <br />of CDRMS mining <br />permit C-2009-087 <br /> <br />All required parameters appear to have been <br />analyzed.
The URL can be used to link to this page
Your browser does not support the video tag.