My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-24_REPORT - C2009087
DRMS
>
Day Forward
>
Report
>
Coal
>
C2009087
>
2017-08-24_REPORT - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2017 10:38:36 AM
Creation date
8/25/2017 8:52:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
Report
Doc Date
8/24/2017
Doc Name
Annual Hydrology Report Adequacy Review
From
DRMS
To
Peabody Sage Creek Mining, LLC
Annual Report Year
2016
Permit Index Doc Type
Hydrology Report
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 <br />Requirement Regulation Comment <br />11. Sampling frequency at <br />surface water <br /> <br />Volume 1, p. 2.04-107 <br />of CDRMS mining <br />permit C-2009-087 <br /> <br />All required sampling frequencies were met: <br /> SSPG6 was not monitored as approved by an <br />update to the monitoring plan with Technical <br />Revision No. 9. This spring is upstream from <br />SSPG6A, which is still sampled annually for <br />Table 12 parameters listed in PSCM pap <br />2.04-108 <br /> SSPG7 was not monitored, this spring no <br />longer exists and was removed from the <br />monitoring plan with Technical Revision No. <br />9. <br /> Spoil springs 1 and 2 are currently a part of <br />SL-4 partial bond release currently under <br />review by the Division. Any decision made <br />on SL4 does not release the sampling <br />requirement at these points. These are also <br />denoted as NPDES points 5 and 6. Monthly <br />sampling of these points began in April 2015. <br /> <br /> <br /> <br />12. Parameters to be sampled <br />at surface water sites <br /> <br />Volume 1, p. 2.04-108 <br />of CDRMS mining <br />permit C-2009-087 <br /> <br />All required parameters appear to have been <br />analyzed. <br />13. Filing frequency of pond <br />reports <br /> <br />CDRMS regulation <br />4.05.9(17) <br /> <br />Sediment ponds associated with C-2009-087 include <br />Ponds 002, 003, 004, PECOCO, the upper sump, the <br />lower sump, and the portal #1 and #2 sumps. <br />Quarterly pond inspections were conducted within <br />the appropriate quarter. <br /> <br />14. Timely filing of pond <br />reports <br /> <br />CDRMS regulation <br />4.05.9(17) <br /> <br />Quarterly pond inspection reports were submitted <br />and received by the Division within an appropriate <br />timeframe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.