Laserfiche WebLink
TRUCK/LOADER TEAM WORK <br />Task description: Transport half of topsoil <br />Site: Silt Pit Permit Action: TR06 SJM <br />PROJECT IDENTIFICATION <br />Task #: 05A State: Colorado <br />Date: 8/23/2017 County: Garfield <br />User: SJM <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Cat 730 <br />-Loader: CAT 972H <br />Support Equipment -Load Area: Cat D9T - 9SU <br />-Dump Area: Cat 139T - 9SU <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Page 1 of 4 <br />Permit/Job#: M1981202SG <br />Abbreviation: None <br />Filename: 05a <br />Shift basis: leer day <br />Cost Breakdown: Truck/Loader Team Sunnort Fouinment Maintenance Fnuinment <br />Total work team cost/hour: $877.25 <br />MATERIAL OUANTITIES <br />Initial volume: 35,700 CCY Swell factor: 1.215 <br />Loose volume: 43,376 LCY <br />Source of estimated volume: 71400 cy avalibile per 2016 annual report_ <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 62,000 Pounds <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />50 <br />30 <br />NA <br />NA <br />Ownership cost/hour: <br />$56.58 <br />$43.47 <br />$100.59 <br />$100.59 <br />NA <br />NA <br />Operating cost/hour: <br />$42.77 <br />$46.72 <br />$43.62 <br />$26.17 <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />30 <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />$10.94 <br />$0.00 <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$2.05 <br />$0.00 <br />NA <br />NA <br />Operator cost/hour: <br />$30.37 <br />$41.20 <br />$41.85 <br />$41.85 <br />NA <br />NA <br />Unit Subtotals: <br />$129.72 <br />$131.39 <br />$188.10 <br />$168.60 <br />NA <br />NA <br />Number of Units: 1 <br />3 <br />1 1 <br />11 <br />1 <br />0 <br />0 <br />Group Subtotals: I <br />Work: <br />$520.55 <br />1 Support: <br />$356.70 <br />Maint: <br />$0.00 <br />Total work team cost/hour: $877.25 <br />MATERIAL OUANTITIES <br />Initial volume: 35,700 CCY Swell factor: 1.215 <br />Loose volume: 43,376 LCY <br />Source of estimated volume: 71400 cy avalibile per 2016 annual report_ <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 1,600 Pounds/LCY <br />Description: Top Soil <br />Rated Payload: 62,000 Pounds <br />CIRCES Cost Estimating Software <br />