My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-23_REVISION - M1981202SG (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981202
>
2017-08-23_REVISION - M1981202SG (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:34 AM
Creation date
8/23/2017 12:09:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981202SG
IBM Index Class Name
Revision
Doc Date
8/23/2017
Doc Name
Reclamation Costs Update and Notice of Surety Increase
From
DRMS
To
Flag Resources, Inc.
Type & Sequence
SI1
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER RIPPING WORK <br />Task description: Rip compacted areas <br />Site: Silt Pit Permit Action: TR06 SJM <br />PROJECT IDENTIFICATION <br />Task #: 04A State: Colorado <br />Date: 8/23/2017 County: Garfield <br />User: SJM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Ripper Attachment: 3 -Shank Ripper <br />Seismic: <br />Area: <br />Permit/Job#: M1981202SG <br />Abbreviation: None <br />Filename: 04a <br />Horsepower: 405 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />2.00 <br />mph <br />Average Ripping Width: <br />7.67 <br />Utilization °o <br />Ownership Cost/Hour: <br />$100.59 <br />NA <br />Operating Cost/Hour: <br />$87.23 <br />100 <br />Ripper Ownership Cost/Hour: <br />$10.94 <br />NA <br />Ripper Operating Cost/Hour: <br />$6.82 <br />100 <br />Operator Cost/Hour: <br />$41.85 <br />NA <br />Total Unit Cost/Hour: <br />$247.43 <br />Acres/hr <br />Total Fleet Cost/Hour: <br />$247.43 <br />feet <br />MATERIAL QUANTITIES <br />Selected estimating method: Area <br />Alternate Methods: <br />Job Efficiency: <br />0.83 <br />NA Bank Volume: NA <br />BCY <br />30.00 acres Rip Depth (ft): 2.00 <br />_ <br />Volume: 9 <br />Source of estimated quantity: Annual report, processing areas <br />HOURLY PRODUCTION <br />Seismic: <br />Seismic Velocity: NA <br />Area: <br />NA <br />800 BCY or CCY <br />feet/second <br />Average Ripping Depth: <br />2.00 <br />mph <br />Average Ripping Width: <br />7.67 <br />degrees <br />Average Ripping Length: <br />100.00 <br />feet <br />Average Dozer Speed: <br />88.00 <br />feet <br />Average Maneuver Time: <br />0.25 <br />feet <br />Production per unit area: <br />0.762 <br />acres/hour <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />0.762 <br />Acres/hr <br />Site Altitude: <br />5,440 <br />feet <br />Altitude Adj: <br />1.00 <br />(CAT HB) <br />Job Efficiency: <br />0.83 <br />(1 shift/day) <br />Net Correction: <br />0.83 <br />multiplier <br />Adjusted Hourly Unit Production: <br />0.63 <br />Acres/hr <br />Adjusted Hourly Fleet Production: <br />0.63 <br />Acres/hr <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />47.43 <br />Unit cost: $391.194 Per acre <br />Total job cost: $11,736 <br />Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.