Laserfiche WebLink
I Violations: <br />"1993019 623/1993 AB 10/29/1993 <br />MAC WHE VIV2004001 120/2004 AB 6/282o04 <br />M-1984-094 TR05 "2006059 9/152006 VA 12/13!2006 )N MINING AND SAFETY <br />VN2008012 11 /24/2008 RE 1/16/2009 <br />V Annual Fee/Report: CW AV2013002 1/9/2013 AB 2222013 B ph(303) 866-3567 <br />AV2014037 10/292014 AB 1/13/2015 <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 1984-094 Site Name: Gloria Z Pit <br />County Park TR# DRMS Use onlyj <br />Permittee: Sandborn Sand and Gravel dba Golden Cross Aggregates <br />Operator (If Other than Permittee): <br />Permittee Representative: <br />Ben Langenfeld AUG 2 2 2017 <br />LAVISION F RECLAMATION <br />Please provide a brief description of the proposed revision: MINING AND SAFETY <br />Addressing items from a DRMS inspection including the incorporation of new roads into the <br />site plan and checking the total pond area versus what is in the permit. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. if the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />I I Oc, 111, 112 construction ❑ <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 ❑ <br />1 IOd, 112d(l, 2 or 3) $1006 ❑ <br />