My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-18_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2017-08-18_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2017 9:05:00 AM
Creation date
8/18/2017 11:14:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
8/18/2017
Doc Name
Reclamation Cost Estimate
From
Clayton Wein
To
Rob Zuber
Type & Sequence
RN4
Email Name
CCW
JRS
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 014 Page 2 of 2 <br /> <br /> <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />Visibility: 1.000 (AVG.) <br />Job efficiency: 0.830 (1 SHIFT/DAY) <br />Spoil pile: 0.600 (FND-SF) <br />Push gradient: 1.000 (CAT HB) <br />Altitude: 1.000 (CAT HB) <br />Material Weight: 0.902 (CAT HB) <br />Blade type: 1.000 (PAT) <br /> <br />Net correction: 0.3369 <br /> <br />Adjusted unit <br />production: 355.63 LCY/hr <br />Adjusted fleet <br />production: 711.26 LCY/hr <br /> <br />JOB TIME AND COST <br /> <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.677/LCY <br /> <br />Total job time: 4.33 Hours <br />Total job cost: $2,085 <br />
The URL can be used to link to this page
Your browser does not support the video tag.