My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-18_REVISION - C1996084
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996084
>
2017-08-18_REVISION - C1996084
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2017 9:05:00 AM
Creation date
8/18/2017 11:14:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Revision
Doc Date
8/18/2017
Doc Name
Reclamation Cost Estimate
From
Clayton Wein
To
Rob Zuber
Type & Sequence
RN4
Email Name
CCW
JRS
RDZ
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bulldozer Worksheet Cont’d Task # 014 Page 1 of 2 <br /> <br /> <br />BULLDOZER WORK <br /> <br />Task description: Replace Live-Handled Topsoil to W-1 <br />Site: Lorencito Canyon Mine Permit Action: RN4 Permit/Job#: C1996084 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 014 State: Colorado Abbreviation: None <br />Date: 8/16/2017 County: Las Animas Filename: C084-014 <br />User: CCW <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown : <br /> Utilization % <br />Ownership Cost/Hour: $100.59 NA <br />Operating Cost/Hour: $87.23 100 <br />Ripper own. <br />Cost/Hour: $10.94 NA <br />Ripper op. Cost/Hour: $0.00 0 <br />Operator Cost/Hour: $41.85 NA <br />Total unit Cost/Hour: $240.61 <br />Total Fleet Cost/Hour: $481.21 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 2,740 <br />Swell factor: 1.125 <br />Loose volume: 3,083 LCY <br />Source of estimated volume: Table 2.05.4-1f <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 125 feet <br />Unadjusted hourly <br />production: <br />1,055.6 LCY/hr <br /> <br />Materials consistency description: Consolidated stockpile 1.0 <br /> <br />Average push <br />gradient: <br />0 % <br />Average site altitude: 7,100 feet <br /> <br />Material weight: 2,550 lbs/LCY <br /> <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source
The URL can be used to link to this page
Your browser does not support the video tag.