Laserfiche WebLink
Page 1 of 2 <br /> <br />CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION/DEMOBILIZATION <br /> <br />Task description: Mobilize/Demobilize Equipment for Pond Cleaning <br />Site: Lorencito Canyon Mine Permit Action: RN4 Permit/Job#: C1996084 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 071 State: Colorado Abbreviation: None <br />Date: 8/17/2017 County: Las Animas Filename: C084-071 <br />User: CCW <br />Agency or organization name: DRMS <br /> <br />EQUIPMENT TRANSPORT RIG COST <br /> Shift basis : 1 per day <br /> Cost Data Source: CRG Data <br /> Truck Tractor Description: GENERIC ON-HIGHWAY TRUCK TRACTOR, 6X4, DIESEL POWERED, <br />400 HP (2ND HALF, 2006) <br /> Truck Trailer Description: GENERIC FOLDING GOOSENECK, DROP DECK EQUIPMENT <br />TRAILER (25T, 50T, AND 100T) <br />Cost Breakdown: <br />Available Rig Capacities 0 -25 Tons 26-50 Tons 51+ Tons <br />Ownership Cost/Hour: $16.63 $18.37 $22.33 <br />Operating Cost/Hour: $44.38 $46.13 $50.07 <br />Operator Cost/Hour: $27.66 $27.66 $27.66 <br />Helper Cost/Hour: $0.00 $25.39 $25.39 <br />Total Unit Cost/Hour: $88.67 $117.55 $125.45 <br /> <br />NON ROADABLE EQUIPMENT: <br />Machine <br />Description <br />Weight/ <br />Unit <br />(TONS) <br />Owner ship <br />Cost/hr/ unit <br />Haul Rig <br />Cost/hr/uni <br />t <br />Fleet <br />Size <br />Haul Trip <br />Cost/hr/ <br />fleet <br />Return Trip <br />Cost/hr/ fleet <br />DOT Permit <br />Cost/ fleet <br />Cat D8T - 8SU 47.71 $83.81 $117.55 1 $201.36 $117.55 $250.00 <br />Cat 324D L 9'-8" <br />Stick <br />27.33 $38.54 $117.55 1 $156.09 $117.55 $250.00 <br /> <br />Subtotals : $357.45 $235.10 $500.00 <br /> <br /> <br />ROADABLE EQUIPMENT: <br />Machine Description Total Cost/hr/ <br />unit <br />Fleet Size Haul Trip <br />Cost/hr/ fleet <br />Return Trip Cost/hr/ fleet <br />Generic 10 -12 cy, 6x4 $87.99 4 $351.96 $351.96 <br />Flatbed Truck, 6x4, 45K GVW $64.89 1 $64.89 $64.89 <br />Subtotals: $416.85 $416.85 <br /> <br />