Laserfiche WebLink
Mobilization Worksheet Cont’d Task # 070 Page 2 of 2 <br /> <br />CIRCES Cost Estimating Software <br /> <br />Machine Description Total Cost/hr/ <br />unit <br />Fleet Size Haul Trip <br />Cost/hr/ fleet <br />Return Trip Cost/hr/ fleet <br />Fuel Tanker, 6x4, 210 HP $56.88 1 $56.88 $56.88 <br />Lube Truck, 6x4, 210 HP $62.54 1 $62.54 $62.54 <br />Flatbed Truck, 6x4, 45K GVW $43.50 1 $43.50 $43.50 <br />Light Duty Pickup, 4x4, 1 T. <br />Crew <br />$47.41 1 $47.41 $47.41 <br /> <br />Subtotals: $210.33 $210.33 <br /> <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: TRINIDAD <br />Total one-way travel distance: 20.00 miles <br />Average Travel Speed: 35.00 mph <br /> <br />Total Non -Roadable Mob/Demob Cost * <br />‘* two round trips with haul rig: $19,541.65 <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: $240.38 <br /> <br />Transportation Cycle Time: <br /> Non - <br />Roadable <br />Equipment <br /> <br />Roadable <br />Equipment <br />Haul Time (Hours): 0.57 0.57 <br />Return Time (Hours): 0.57 0.57 <br />Loading Time (Hours): 0.50 NA <br />Unloading Time (Hours): 0.50 NA <br />Subtotals: 2.14 1.14 <br /> <br />JOB TIME AND COST <br /> <br /> Total job time: 4.29 Hours <br /> <br />Total job cost : <br /> <br />$19,782 <br />