My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-16_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2017-08-16_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2017 7:04:15 AM
Creation date
8/18/2017 7:01:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
8/16/2017
Doc Name Note
(RN1)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Elk Ridge Mining and Reclamation, LLC
Permit Index Doc Type
Findings
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> 6 <br />TR-7 updated the as-built information for the East and West Ditches of Pond NHN-001. TR-7 <br />was issued on December 9, 2014. <br /> <br />TR-8 incorporated the construction certification for the Southeast Haul Road. TR-8 was issued on <br />August 11, 2015. <br /> <br />TR-9 changed the inlet location of the north ditch into Pond NHN-002. TR-9 was issued on March <br />31, 2015. <br /> <br />TR-10 incorporated the as-built certification for Pond NHN-002. TR-10 was issued on October 6, <br />2015. <br /> <br />TR-11 incorporated responses to adequacy questions raised in the midterm review. TR-11 was <br />issued on January 26, 2016. <br /> <br />TR-12 updated the blasting performance standards. TR-12 was issued on February 9, 2016. <br /> <br />TR-13 incorporated a new design for the upper segment of the NHN-001 East ditch. TR-13 was <br />issued on August 23, 2016. <br /> <br />TR-14 incorporated a new dryland pasture reference area, updated interim vegetation monitoring <br />schedule and updated seed mixtures. TR-14 was issued on June 27, 2017. <br /> <br />TR-15 updated the postmining topography and CCC 2nd Park Lateral pipeline location. TR-15 <br />was issued on May 30, 2017. <br /> <br />Minor Revisions <br /> <br />MR-1 incorporated the Air Pollution Control Division's Compliance Order on Consent. MR-1 was <br />issued on November 2, 2012. <br /> <br />MR-2 proposed to incorporate the as-built configuration and professional certification for <br />Sediment Pond NHN-001. MR-2 was withdrawn on January 30, 2013. <br /> <br />MR-3 proposed to add a new Section 2.05.3(6)(a) - Overburden Blasting to the permit. MR-3 was <br />withdrawn on March 7, 2013. <br /> <br />MR-4 incorporated a Substitute Water Supply Plan into the permit. MR-4 was issued on April 10, <br />2013. <br /> <br />MR-5 updated the reclamation cost estimate and mine facilities sections of the permit to <br />incorporate a water well. MR-5 was issued on June 18, 2013. <br /> <br />MR-6 incorporated a Compliance Order on Consent issued by the Air Pollution Control Division. <br />MR-6 was issued on May 17, 2013. <br />
The URL can be used to link to this page
Your browser does not support the video tag.