My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-16_REVISION - C1981035 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981035
>
2017-08-16_REVISION - C1981035 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 9:01:27 AM
Creation date
8/17/2017 8:57:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035
IBM Index Class Name
Revision
Doc Date
8/16/2017
Doc Name
Adequacy Review Response #2
From
GCC Energy, LLC
To
DRMS
Type & Sequence
RN7
Email Name
RDZ
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
King Coal Mine (C-1981-035) RN -07 Adequacy Review #2 Response <br />• Please update the Reclamation Cost Estimate appendix to include the most recent estimate performed by <br />the Division (to be sent in separate email). <br />Please find attached replacement King II "Appendix 12(1), Reclamation Bond <br />Estimate prepared by Colorado Division of Reclamation, Mining & Safety". <br />Please delete Appendix 12(2) in its entirety. Also included is updated King II <br />Table of Contents page iii which changes the obsolete "Appendix 12(2)" <br />designation under Appendix 12 to "Appendix 12(1)". <br />Adequacy Item #41 <br />KII Section 2.05.3, Page 5 <br />CDRMS 8114117: The approved PAP text states that discharges from the SAE by the King II entrance will be <br />sampled. Please explain GCC's rationale for altering this commitment. <br />GCCE August 14, 2017: <br />Original text concerning SAE sampling has been restored to 2.05.3 page 5. <br />Adequacy Item #42 <br />KII Section 2.05.3, Page 6 <br />CDRMS 8114117: Please add a statement that prior to water being pumped from the pond to the native channel, <br />the water will be sampled, and it will not be discharged to the native channel unless it meets effluent limitations. <br />GCCE August 14, 2017• <br />2.05.6 page 6 text has been revised as requested. <br />Adequacy Item #44 <br />KII Section 2.05.3, Page 7 (formerly page 6a) <br />CDRMS 8114117: I believe that you misinterpreted my previous intent for editing this page. Please re -write the <br />fourth paragraph as follows: <br />"A further discussion of topsoil salvage, protection, and stabilization at exploration drill pads (as well as <br />monitoring well pads) is contained in Sections 2.04.6 and 2.04.9. " <br />GCCE August 14, 2017: <br />King II 2.05.3 page 7, paragraph 4, has been revised as requested. <br />Adequacy Item #61 <br />CDRMS 8114117: The King II Ditch Capacity table in Appendix 11 still has some values that do not match the <br />as -built details (Map King II -007B, last updated in December 2015). For example, the bottom width of the <br />lower portion of CWD-IA is 1.6 feet in the table but 1.0 feet in the details on the map. Also, there appears to be <br />a discrepancy for the depths for CWD-I C and ID. Please check all values and explain or revise. <br />GCCE August 14, 2017: <br />The Ditch Capacities table from Appendix 11 has been revised to match the <br />surveyed measurements of Map King II -007B and is included herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.