My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-14_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2017-08-14_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 12:18:11 PM
Creation date
8/14/2017 12:14:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
8/14/2017
Doc Name Note
RN-7(Findings & Cost Estimate)
From
DRMS
To
Coors Energy
Permit Index Doc Type
Findings
Email Name
RAR
DIH
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOTOR GRADER WORK <br />Task description: Final grade 49 acres within long term spoil area <br />Site: Keenesburg Strip Mine Permit Action: RN7 Permit/Job#: C1981028 <br />PROJECT IDENTIFICATIOIS <br />Task #: A03 <br />Date: 7/19/2017 <br />User: RAR <br />State: Colorado <br />County: Weld <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Abbreviation: None <br />Filename: A03 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0-2.5 mph) - 1.5 <br />Utilization % <br />Ownership Cost/Hour: <br />$54.68 <br />NA <br />Operating Cost/Hour: <br />$46.99 <br />100 <br />Ripper Ownership Cost/Hour: <br />$0.00 <br />NA <br />Ripper Operating Cost/Hour: <br />$0.00 <br />Unadjusted Hourly Unit Production: <br />Operator Cost/Hour: <br />$38.16 <br />NA <br />Total Unit Cost/Hour: <br />$139.83 <br />Source <br />Total Fleet Cost/Hour: $139.83 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />49.00 <br />2010 ARR <br />acres <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0-2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />12.10 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />10.10 <br />feet <br />Unadjusted Hourly Unit Production: <br />1.8364 <br />acres/hour <br />Job Condition Correction Factors <br />Site <br />Altitude: 4000 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh/d, fay.) <br />Net Correction: 0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />1.6527 <br />acres/Hour <br />Adjusted Hourly Fleet Production: <br />1.6527 <br />acres/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />29.65 Hours <br />Unit cost: $84.61 per acre <br />Total job cost: <br />$4,146 <br />
The URL can be used to link to this page
Your browser does not support the video tag.