My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-14_GENERAL DOCUMENTS - C1981028
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981028
>
2017-08-14_GENERAL DOCUMENTS - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2017 12:18:11 PM
Creation date
8/14/2017 12:14:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
General Documents
Doc Date
8/14/2017
Doc Name Note
RN-7(Findings & Cost Estimate)
From
DRMS
To
Coors Energy
Permit Index Doc Type
Findings
Email Name
RAR
DIH
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Ad': 1.000 NA (CAT HB) <br />Job Efficiencv: 0.830 NA (CAT HB) <br />Site Altitude: 4000 feet <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, maintained 3.0 <br />Haul Route: <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />00m) <br />Travel Time <br />(min) <br />1 <br />1200.00 <br />-3.00 <br />3.00 <br />0.00 <br />2965 <br />0.58 <br />Haul Time: 0.58 minutes <br />Return Rrnrte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />1200.00 <br />3.00 <br />3.00 <br />6.00 <br />2638 <br />0.63 <br />Return Time: <br />0.63 <br />minutes <br />Total Scraper team cycle time: <br />2.81 <br />minutes <br />Adjusted for job conditions: <br />1,014.84 <br />LCY/Hour <br />Selected Number of Scrapers: <br />4 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />2,029.68 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />2,029.68 <br />LCY/Hour <br />Unadjusted unit production/hour: 1,222.70 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.887 <br />Team(s) Total job time: 141.15 Hours <br />/LCY Total job cost: $254,141 <br />
The URL can be used to link to this page
Your browser does not support the video tag.