Laserfiche WebLink
location and depth of each hole. All topsoil verification holes were dug and measure to at least 18” as per the <br />Colowyo Mine’s PAP. No issues were encountered. For addition information regarding topsoil for the SL-12 <br />application, please refer to the Division’s inspection report dated June 22, 2017. <br /> <br /> <br />Hole <br />Number <br />Reclamation <br />Parcel <br />Depth <br />(inches) <br />1 16013 21 <br />2 16016 20 <br />3 16016 21 <br />4 16012 20 <br />5 16015 25 <br />6 16016 23 <br />7 16016 21 <br />8 16016 20 <br />9 16011 24 <br />10 16009 19 <br />11 16016 19 <br />12 16011 24 <br />13 16016 26 <br />14 16009 18 <br />15 16005 21 <br />16 16002 18 <br />17 16002 19 <br /> <br />