My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-09_PERMIT FILE - M1995030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1995030
>
2017-08-09_PERMIT FILE - M1995030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 11:17:00 PM
Creation date
8/9/2017 3:46:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995030
IBM Index Class Name
PERMIT FILE
Doc Date
8/9/2017
Doc Name
Adequacy Review Response
From
Environment, Inc
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINING PLAN EXHIBIT D (cont) <br /> MINING PLAN <br /> There are 51 . 16 acres ± in the affected lands, 46 . 67 acres ± <br /> will be disturbed as part of the mining operation. Please refer <br /> to the Mining Timetable for the estimated acreage of each area <br /> associated with the mining part of this operation. <br /> As a reminder all setbacks around the mine will be used as <br /> areas to stockpile growth medium and will contain, access roads <br /> around the mined area . Some stockpiling of raw and finished <br /> material may also be stored in the areas around the Plant Site <br /> and the Northwest corner of the existing lake where it is placed <br /> to drain after being mined. The setback lines on Map Exhibits F& F-1 <br /> are the indication of the mining limits, i .e . the top of the <br /> slope into the lake area. Once the bank slopes are established <br /> and we are assured the setbacks will no longer be disturbed they <br /> will be reclaimed in the prescribed manner <br /> MINING TIMETABLE. <br /> The continuing uncertainty of economic conditions in the <br /> construction materials industry precludes an accurate forecast of <br /> demand during the life of the mine . We therefore, elect to <br /> estimate the mining timetable based on an average year and expect <br /> a specific year to vary widely from the average. <br /> Table 0-1 MINING TIMETABLE (revised 4/19/17) <br /> TOTAL MINED AREA AVERAGE YEARLY <br /> AREA YEARS AREA (ACRES) PRODUCTION (TONS) <br /> (ACRES) <br /> Stage I 25-33 27.11 21.84 70, 000 <br /> Stage II 9-11 14.65 10.16 70, 000 <br /> Phase III LIFE OF 9.40 0.00 0 <br /> (Plant site) MINE <br /> Totals 1 51.16 32.00 <br /> 6 (revised 8/3/17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.