My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-09_PERMIT FILE - M1995030
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1995030
>
2017-08-09_PERMIT FILE - M1995030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 11:17:00 PM
Creation date
8/9/2017 3:46:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995030
IBM Index Class Name
PERMIT FILE
Doc Date
8/9/2017
Doc Name
Adequacy Review Response
From
Environment, Inc
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D <br /> MINING PLAN AND TIMETABLE <br /> Unless specifically discussed below, the methods described <br /> and approved in the original 2012 permit application, including <br /> the parts of the mining and reclamation plans will remain un- <br /> changed. The current bond is $25, 500 . Mining will continue to be <br /> done with a dredge, using a wet mining technique . As discussed <br /> in the existing Mining Plan some blasting may take place on this <br /> mine . <br /> We have revised Map Exhibits C - Current Conditions Map to <br /> show the new permit boundary and updated the current conditions <br /> at the mine . The existing lake area has increased as mining has <br /> progressed since the original approval . Map Exhibit C-1 Mining <br /> Plan Map was updated to show the new area only. <br /> Proposed changes. <br /> The primary reason for this Amendment is to increase the <br /> permit/affected Land area by 4 . 34 acres to include additional <br /> area around the north and west sides of the existing of the mine . <br /> This is needed on the north side to provide adequate area for the <br /> setbacks so the slopes into the excavated area can be graded as <br /> approved in the Mining Plan . This amendment is to complete the <br /> commitment McAtee Construction Company. made during our response <br /> to the problems noted in a January 12 , 2017, inspection report . <br /> A section of the north line actually crosses diagonally a <br /> portion of the northwest corner of an old lake area mined prior <br /> to 1976 by another party. Much of the sloping in this area is <br /> steeper then 3h: ly but is a stable "pre-existing" slope . <br /> Along the west side we have included a larger portion of the <br /> old mined area to have room to expand the Plant Site if needed <br /> and to better define the west line . We will not reclaim any of <br /> the area in the old mined areas unless it is redisturbed by our <br /> activities . The revisions to the Mining Plan include increasing <br /> the total mine area and an update to the Mining Timetable to <br /> account for the permit area increase . <br /> 5 (revised 8/3/17) <br />
The URL can be used to link to this page
Your browser does not support the video tag.