Laserfiche WebLink
TRAPPER MINE <br />RECLAIMED PARCEL HISTORY <br />Parcel Designation: A-B-09oak Acreage: 0.3 <br />Reclamation Year(s) of <br />Activity Occurrence Comments <br />Regrade <br />2009 <br />Topsoil Replacement <br />2009 <br />Depth (inches): 14.4", 9" <br />How Measured: Load Counts, DRMS <br />Topsoil Origin: Stockpile © Livehaul x <br />Topsoil from pile Z108 (12,516 CYs). <br />Remainder was live -hauled (5,880 CYs). <br />Note: Topsoil replacement was part of A -B-09 <br />reclamation. <br />Seedbed Preparation <br />2009 <br />Dragging Disking ❑ Other X (explain) <br />Motor Grader (Blade) <br />Fertilization <br />N/A <br />Product Used: <br />Rate: <br />Seed Mixture(s) <br />2009 <br />Refer to Table(s) Range Site AB <br />Bond ReleaseTSP- <br />hase I <br />Phase II <br />Phase III <br />Application #L-18 <br />SLA 9 <br />Approval Date <br />Comments:Corridor running through Oak Drainage was carved out of reclaimed parcel A- <br />B -09, as per DRMS mandate. Major repairs to drainage accomplished in 2012. <br />MARECLMHS <br />