My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-08_REVISION - M1973021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973021
>
2017-08-08_REVISION - M1973021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:41 PM
Creation date
8/8/2017 3:28:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973021
IBM Index Class Name
Revision
Doc Date
8/8/2017
Doc Name
Request for Technical Revision
From
Aggregate Industries GEI Consultants, Inc.
To
DRMS
Type & Sequence
TR5
Email Name
MAC
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Introduction <br /> This Technical Revision(TR)provides GEI Consultants, Inc. (GEI) revised highwall <br /> recommendations for quarry development within the South Quarry of the Aggregate <br /> Industries (AI) Morrison Quarry mine. This TR also presents the revised highwall <br /> configuration and demonstrates the highwall design and quarry development meet the <br /> minimum required factors of safety for rock stability (FOS > 1.2). It also summarizes the <br /> field mapping, investigation, and stability analyses performed in support of the highwall <br /> recommendations presented herein. The Morrison Quarry is currently operating under permit <br /> M-1973-021 from the Colorado Division of Reclamation, Mining, and Safety(DRMS). <br /> The first step toward maintaining wall stability and mitigating rock-fall hazards is to begin <br /> with a plan based on sound engineering applied to available geological data and planning to <br /> evaluate the long-term stability of highwalls. Equally important is the need for ongoing <br /> refinement of stability assessments, based on changes in wall geometry and geological <br /> conditions observed within the active South Quarry. <br /> As mining advances and mine design standards undergo operational changes, it is crucial any <br /> geotechnical assumptions be reviewed and modified by an experienced engineer or geologist <br /> to evaluate the integrity of the final highwall design and reduce the potential for highwall <br /> instability and rock-fall hazards. <br /> 1.1 Site Description <br /> The Morrison Quarry is a hard rock quarry, owned and operated by Al, located <br /> approximately half a mile west of Colorado Highway 8 and approximately half a mile north <br /> of U.S. Highway 285 in Morrison, Colorado. The mine site is located west of the Dakota <br /> hogback along the Front Range west of Denver, Colorado, in Section 10 of Township 5 <br /> South, Range 70 West of the 6th Principle Meridian. The site location map is shown in <br /> Figure 1. <br /> The Morrison Quarry consists of three cells;the North Quarry, the Central Quarry, and the <br /> South Quarry. Active mining no longer occurs within the North or Central Quarries. The <br /> North Quarry currently holds water utilized as mine process water. Within the North Quarry <br /> footprint, the North Repository acts as a repository area for waste material from mine <br /> operations and damaged or inoperable mine equipment. The North Quarry was mined to an <br /> approximate bottom elevation(El.)of 6220 feet above mean sea level (MSL)utilizing <br /> highwalls and benches at a nominal 1 horzontal:1 vertical (H:V) slope. <br /> The Central Quarry was mined to an approximate bottom El. 6330 utilizing highwalls and <br /> benches at a nominal 1 H:1 V or steeper slope. In 2016,reclamation was effectively completed <br /> within the Central Quarry when the southwest corner was backfilled even with the <br /> Aggregate Industries Morrison Quarry GEI Consultants, Inc. <br /> South Quarry Highwall Design Technical Revision 1 August 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.