Laserfiche WebLink
July 19, 2017 C-1994-082/Yoast Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 6 of 14 <br /> <br />011A. Pond 010, Pond 013 and Pond 014 were approved as permanent impoundments, with Pond 010 receiving <br />run-off from Phase I area 15, Pond 013 receiving run-off from Phase I areas 3 and 4, and Pond 014 receiving run- <br />off from Phase I areas 2 and 9 and Phase III area 13. Ponds 011 and 012 have yet to receive permanent pond <br />approval. Pond 011 receives run-off from Phase I area16 and Phase III areas 20, 9, 6, and 1. Pond 012 receives <br />run-off from Phase I areas 18, 11, 27, 28, 20, 21, 19, 25, 24, 10, 6, 26, 23, 5, 22, 17, 1, 30 and run-off from Phase <br />III areas 10, 15, and 14. All ponds were holding water at the time of the inspection with only pond 012 <br />discharging at the time of the inspection. The water in the Ponds was clear with no heavy sediment observed. The <br />reclaimed drainages and ditches were inspected and found to be in good condition. The bond release area was <br />stable with no major signs of instability, erosion, or movement. <br /> Phase III YPM 10 and YPM 21A <br /> Phase III YPM 13 and Pond 011A