Laserfiche WebLink
July 19, 2017 C-1994-082/Yoast Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 1 <br />Number of Complete Inspections this Fiscal Year: 0 <br /> <br /> Page 5 of 14 <br /> <br /> Phase I Area 27 and 28 <br /> Phase I Area 24 and 26 <br /> <br />FISH and WILDLIFE – Rule 4.18: <br /> <br />The post-mining land use for the Yoast Mine is livestock grazing and wildlife habitat. No cattle were observed <br />during the bond release inspection; however the grazing activity within the Yoast Permit is documented in the <br />Annual Reclamation Reports (ARR) submitted yearly to the Division. Heavy elk and deer presence is routinely <br />observed during monthly I&E inspections. The entire bond release area inspected displayed excellent wildlife <br />habitat and grazing lands. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br />4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br />Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage – Acid and Toxic Materials 4.05.8; <br />Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> <br />The Yoast Mine’s SL-6 Phase III bond release area was approved for Phase II Release under SL-2 and SL-3 in <br />2012. The Phase III areas includes all or part of permanent established drainages YPM-21, YPM-21A, YPM-21B, <br />YPM-10, YPM-9, YPM-13 and YPM-12. The permanent stock pond in the Phase III bond release area is Pond