Laserfiche WebLink
COLORADO <br /> Division of Reclamation, <br /> A7t,lini ng and Safety <br /> MINERALS PROGRAM INSPECTION REPORT <br /> PHONE: (303) 866-3567 <br /> The Division of Reclamation,Mining and Safety has conducted an inspection of the mining operation <br /> noted below. This report documents observations concerning compliance with the terms of the permit <br /> and applicable rules and regulations of the Mined Land Reclamation Board. <br /> MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br /> Parker-Dersham Resource M-2006-003 Sand and gravel Weld <br /> INSPECTION TYPE: INSPECTOR(S): INSP.DATE: INSP.TIME: <br /> Surety-Related Inspection Eric C. Scott July 27,2017 09:00 <br /> OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br /> Hall-Irwin Aggregates,LLC Brett and John Hall 112c-Construction Regular Operation <br /> REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br /> Surety Related Partial Bond $974,000.00 <br /> DATE OF COMPLAINT: POST INSP.CONTACTS: JOINT INSP.AGENCY: <br /> NA None None <br /> WEATHER: INSPECTOR'S SIGNATURE: SIGNATURE DATE: <br /> Clear July 28,2017 <br /> The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br /> SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br /> WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br /> Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br /> Reclamation Board will consider possible enforcement action. <br /> INSPECTION TOPIC: Slides & Other Damage <br /> PROBLEM/POSSIBLE VIOLATION: Problem: Erosion gullies and ruts were observed on-site. This is a problem at <br /> this time for failure to protect the affected land from erosion pursuant to C.R.S. 34-32.5-116 (4) (j). <br /> CORRECTIVE ACTIONS:The operator shall provide photo documentation to the Division verifying erosion gullies <br /> and ruts have been repaired, and that the site has have been reconstructed and stabilized to prevent erosion <br /> damage by the corrective action date. <br /> CORRECTIVE ACTION DUE DATE: 8/31/17 <br /> INSPECTION TOPIC: Signs & Markers <br /> PROBLEM/POSSIBLE VIOLATION: Problem: The affected area boundary markers are missing or incorrectly <br /> placed. This is a problem for failure to maintain boundary markers around the affected area as required by <br /> Section 3.1.12(2) of the rule. <br /> CORRECTIVE ACTIONS:The operator shall conduct a survey and replace the boundary markers in the correct <br /> location(s). The operator shall provide proof to the Division that this has been done by the corrective action <br /> date. <br /> CORRECTIVE ACTION DUE DATE: 8/31/17 <br /> Page 1 of 4 <br />