My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-27_PERMIT FILE - P2017018
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2017018
>
2017-07-27_PERMIT FILE - P2017018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2020 11:28:21 PM
Creation date
7/27/2017 2:31:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2017018
IBM Index Class Name
Permit File
Doc Date
7/27/2017
Doc Name
BLM Plan of Operations
From
Adam Barger
To
DRMS
Email Name
DMC
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ILIONELLE PLAN OF OPERATIONS] <br /> General Information <br /> The Lionelle Lode mining claim is located within the Browns Canyon mining district. The <br /> Lionelle operation is a new operation with a proposed startup date of 6/1/2018 and is expected to <br /> cease on 6/l/2028. This will be a seasonal operation only, with the season lasting from June to <br /> September, weather permitting. The expected duration of the operations is 5-10 years. <br /> Principals <br /> Operations operator: <br /> Adam Barger <br /> 205 Maxwell Ave <br /> Hightstown,NJ 08520 <br /> 732-801-5422 <br /> bigbarger@yahoo.com <br /> Property Description <br /> MC# Name Lode/Placer Quarter Section Township Range <br /> Section <br /> CMC#287726 Lionelle Lode NW% 27 51N 8E <br /> and NE <br /> Description of the operations <br /> Access <br /> Operator will be accessing the claim using the existing county road 194 directly off of US highway 285. <br /> All roads are in good repair and will require no improvements. <br /> Attached as Exhibit A is a current topographical map showing the proposed access to the operation. <br /> Vehicles ;tnti E(pliplit nt <br /> Vehicles being used will be registered for highway and off highway use. <br /> 5trtict1res <br /> There will be no modification or disturbances of any existing structures. <br /> Project Uescz-iption <br /> Operator plans to dig open existing shafts with a hand shovel. Once shafts have been dug open to a <br /> workable size, operator plans to have a contractor complete secure gating on two shafts to keep both <br /> the mine workings and public safe.Once the shafts have been reopened and secured, internal sampling <br /> of the mine will occur. Internal sampling will be completed with a rock hammer and chisel. <br /> Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.