2-3 Front end loaders <br />- 1 D-8 Bulldozer <br />1 40G Motor grader <br />14000 gallon water truck <br />Volvo off road haul trucks (number will depend upon production needs) <br />15 and 24 ton on -road haul trucks (number will depend upon production needs) <br />All fuel tanks will have secondary containment. Some are double walled, others will be located <br />within bermed or lined areas that have over 110% of the volume of the largest stored tank. All <br />such tanks will be kept at the office area immediately southwest of Pit 1. See Map C-2. <br />No night mining activity is scheduled for the operation; however portable lighting may be used <br />within the pit from time to time. The portable lights will only be used at the bottom of the pit for <br />the purpose of after hour equipment maintenance and crushing activities within the permitted hours <br />in the winter months while the days are shorter. Portable toilets will be used for employees. All <br />mining structures on site are shown on Map C-2. The portable mining equipment such as loaders, <br />dozers, trucks and excavators will be serviced on an as -needed basis onsite. Upon reclamation, all <br />portable equipment will be removed from the site. <br />There will be no new fence around the operation, since it is inside private property. No problems <br />are expected with vandalism. It is extremely unlikely that any toxic or acid -producing materials <br />will be encountered during the mining operation since the past mining shows that the material is <br />alluvial in nature. However, in the event that such materials are encountered, they will be covered <br />with subsoil and topsoil from the stockpiles to the same depths outlined in the reclamation plan <br />and no more mining will occur in this area. <br />The operator commits to clearly marking the permit boundary with stakes surveyed on site. <br />The site will use all existing roads to haul the product to its final destination. It is planned that <br />the material may be used to re -surface existing roads, make concrete aggregate or provide new <br />road base for any new roads within an economic distance to the site. <br />Tri County Pit Sept 2016 D-5 <br />