Laserfiche WebLink
I*1 I Huddleston -Berry <br />Fngincering & Testing, LLC <br />Appendix U <br />640 White Avenue, Unit B <br />Grand Junction, Colorado 81501 <br />Phone: 970-255-8005 <br />Fax: 970-255-6818 <br />HuddlestonBerry@Bresnan.net <br />Construction Quality Assurance Plan <br />Detention Pond <br />McClane Canyon Mine <br />Garfield County, Colorado <br />Quality Assurance Plan Purpose — Ensure compliance of materials, workmanship, <br />construction, and functional performance of compacted clay liner with the design of the <br />detention ponds. <br />A. Quality Assurance Organization <br />1) Project Engineer —Michael A. Berry, P.E. <br />2) Field Testing Services Manager — Jason D. Collard <br />3) Field Testing Submittals — Jesse Lueras <br />B. Proposed Construction <br />1) The proposed construction includes the sediment pond lined with a 12 - <br />inch thickness low permeability soils liner. The soils liner is proposed to <br />be constructed using native clay soils or native soils amended with <br />bentonite. The approximate size of the pond is summarized in the <br />following table. <br />2) <br />Pond # <br />Storage Volume <br />(ft) <br />Pond Area <br />(ft) <br />1 <br />82,764 <br />14,309 <br />C. Referenced Documents <br />1) Solid Waste Guidance Document Concerning Solid Waste Site and <br />Facility Engineering Design Quality Assurance/Quality Control Plans for <br />Disposal Cell Subgrade, Liner, Leachate Collection System (including <br />Sumps) and Protective Layer Components by the Colorado Department of <br />Public Health and Environment, January 14, 2010. <br />