My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-11_REVISION - C1981010
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2017-07-11_REVISION - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 10:03:01 AM
Creation date
7/12/2017 10:55:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
7/11/2017
Doc Name
Adequacy Review - Preliminary
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
PR8
Email Name
RAR
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> <br />12 <br />Trapper Mine PR8 Preliminary Adequacy Review <br />Prepared by: R. Reilley July 2017 <br />27. Colors and weights of lines for Active mining and As Built Culvert are too similar to easily <br />discern. Please increase the weight of the line for Active mining. <br />28. Please increase the weight of the line for Drainage Boundary. <br />29. Colors and weights of lines for Subdrainage Boundary and Hydraulic Length are too <br />similar to easily discern. Please increase the weight of the line for Subdrainage Boundary, <br />also, maybe make it a darker blue. <br />30. Colors and weights of lines for Subdrainage Boundary and Collection Ditch are too similar. <br />Please change the color of one of these layers. <br />31. Name the proposed sediment ponds on the map so that the exact location of the modeled <br />ponds can be determined <br /> <br />Rule 4.08.2 Pre Blasting Survey <br /> <br />DRMS received the affidavit of publication for TMI’s March 2017 – March 2018 notice of intent to <br />conduct blasting, as per Rule 4.08.3. This notice is relevant for the current permit term and permit <br />boundary. As the mine plan changes and the possibility of a revised permit boundary becomes a <br />reality TMI’s notification and survey requirements as per rule 4.08.2 will require demonstration. <br /> <br />Currently the permit addresses this rule adequately. <br /> <br />Rule 4.08.4(7a,7b) Surface Blasting Requirements – min distances 1000 ft. and 500 ft. <br /> <br />The permit addresses this rule adequately. <br /> <br />Revised Pages <br /> <br />32. Revised pages for the Tables section of the Table of Contents include pages iii-5 through iii- <br />8. For consistency with other permit pages, please label, in the upper left hand corner, this <br />page as: List of Tables –continued. <br />33. Revised pages for the Maps section of the Table of Contents includes pages iv-2. For <br />consistency with the following permit page submitted as iv-4, please label, in the upper left <br />hand corner, this page as: List of Maps–continued. <br />
The URL can be used to link to this page
Your browser does not support the video tag.