Laserfiche WebLink
June 21,2017 C-1981-019/Colowyo Coal Mine ZTT <br /> 17 topsoil verification holes were dug and measured during this inspection in order to verify topsoil depths within <br /> the areas being requested for Phase II within the SL-12 application. Topsoil depth requirements have changed <br /> throughout the years at the Colowyo Mine. At the time of the Section 16 reclamation,topsoil depth requirement <br /> Z AUQU& z ntBffNSIR `RRO3BWVd IM IQP 1:P U"R F RUWR P DW <br /> regarding topsoil depth requirements for the Colowyo Mine,please refer to Rule 2, Section 2.05 and Rule 4, <br /> Section 4.06 of the Colowyo Permit. Each of the 17 topsoil verification KP,@NZ HIRU Ice 1W 1? JU®Q❑ <br /> depth. Holes were dug with the assistance of a backhoe provide by the Colowyo Mine. Each hole was immediately <br /> backfilled and reseeded after the depth of topsoil was verified. The following table and map show the location and <br /> depth of each hole. All topsoil verification holes were dug and P H jW EM 1Gji-VD <br /> PAP.No issues were encountered. <br /> Hole Reclamation Depth <br /> Number Parcel (inches) <br /> 1 16013 21 <br /> 2 16016 20 <br /> 3 j 16016 21 <br /> 4 16012 20 <br /> 5 16015 25 <br /> 6 16016 23 <br /> 7 16016 21 <br /> 8 16016 20 <br /> 9 16011 24 <br /> 10 16009 19 <br /> 11 16016 19 <br /> 12 16011 24 <br /> 13 16016 26 <br /> 14 16009 18 <br /> 15 16005 21 <br /> 16 16002 18 <br /> 17 16002 19 <br /> Number of Partial Inspection this Fiscal Year: 9 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 5of10 <br />