My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-06_INSPECTION - C1981019
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
2017-07-06_INSPECTION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2020 12:01:52 PM
Creation date
7/7/2017 6:42:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Inspection
Doc Date
7/6/2017
Doc Name
Inspection Report
From
DRMS
To
Colowyo Coal Company
Inspection Date
6/21/2017
Email Name
ZTT
JRS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 21,2017 C-1981-019/Colowyo Coal Mine ZTT <br /> Nor- <br /> Wilson Storage Pond <br /> ROADS ❑Rule 4.03 <br /> Construction 4.03.1(3)/4.03.2(3) <br /> Drainage 4.03.1(4)/4.03.2(4) <br /> Surfacing and Maintenance4.03.1(5)and(6)/4.03.2(5) and(6) <br /> Reclamation 4.03.1(7)/4.03.2(7): <br /> Construction of the Collom Haul Road continues. The extent of the haul road topsoil stripping continues from <br /> approximately the intersection with Moffat County Road 51,up to approximately where the haul road would meet <br /> the permitted facility area. Rock scaling continues along some of the rock outcrop areas. <br /> REVEGETATION ❑Rule 4.15 <br /> Vegetative Cover;Timing: <br /> Topsoil verification holes were dug along the reclaimed Section 16 Pit. Each hole was backfilled and reseeded <br /> after measurements Z I IUT RHWF P DEPISOORMELMONFU 17SNRKXNHFVPQM RLM <br /> TOPSOIL ❑Rule 4.06 <br /> Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3;Redistribution 4.06.4: <br /> Topsoil pies 20A, 21A and 2 1 D have been constructed and roughed in. Finish grading and reseeding has not yet <br /> occurred on the topsoil piles. All piles have had ring ditches constructed along the footprint of each pile for <br /> sediment control. <br /> Topsoil Piles 25A, 29A and 30B were currently being constructed along the Collom Haul Road at the time of the <br /> inspection. <br /> Colowyo had submitted a combination Phase I1 and Phase III bond release(SL-12)request for the reclaimed <br /> Section 16 Pit area. As Per Rule 3.03,topsoil verification is required for Phase 11 bond release request. Atotal of <br /> Number of Partial Inspection this Fiscal Year: 9 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 4of10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.