Laserfiche WebLink
V Ft. <br />h <br />f � � <br />File No.: M - <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 2I5, Denver, Colorado 80203 nti«11"9 <br />77-227 <br />T R03 M-1 <br />1tE_ OUEST FOR TECHNICAL Complied! <br />1/0 Violations: <br />1977-227 Me; <br />Costilla <br />County <br />Super -Ex, LLC <br />Site Name: <br />RUS Use on! <br />ceIVED <br />Operator (If Other than Permittee): JUN 2 ?2017 <br />Pennittee Representative: Bill Tezak MIIVIN6 & SA MArlo <br />Please provide a brief description of the proposed revision: R E v 15 t< o P C" i'+ o r1 To A <br />PKA-SE-V> Mt4W6r' PL-A-ri A"P CpNCvrtR€NT �`CL_AMRTIonl pt-l�,iJ. <br />As defined by the Minerals Rules, a Technical Revision (TR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make, the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre -defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Twe R uired TR Fee Submitted (mark only one) <br />110c, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 <br />I 10d, 112d(1, 2 or 3) $1006 <br />