<br />Aggregate Industries Morrison Quarry GEI Consultants, Inc. <br />Geotechnical Addendum, 2016 Annual Report 3 January 2017 <br />2. 2016 Mining Summary <br />2.1 North Quarry <br />Mining in the North Quarry was completed in 2007 therefore no mining activity occurred in <br />the North Quarry in 2016. The North Quarry is currently being used as a raw water storage <br />reservoir for the Town of Morrison and production water storage for AI. The pond has a <br />water elevation of approximately 6396 feet above MSL. Fig. 2 shows the current <br />configuration of the North Quarry, including the reservoir and the North Repository. <br />2.2 Central Quarry <br />Mining activity was completed in the Central Quarry in 2001. No mining activity occurred in <br />2015 and the Central Quarry experienced no major rock disturbances. Reclamation is now <br />complete to El. 6500 in the Central Quarry and the south side of the quarry (Fig. 3) is now <br />being used to temporarily stockpile stripped materials including overburden, sillimanitic <br />gneiss, and other undesirable material from the South Quarry as future reclamation backfill <br />material. AI does not anticipate increasing the reclamation elevation. In addition, jade air fines <br />slurry was placed in the Central Quarry, filling the remaining area to be reclaimed. Fig. 3 <br />shows the configuration of the Central Quarry. <br />2.3 South Quarry <br />Mining operations continued in the South Quarry in 2016. The 2016 mining operations did <br />not result in an expansion of the South Quarry 2015 mining footprint. Mining occurred <br />primarily on the west (east facing) and south (north facing) portions of the South Quarry. A <br />new lower bench, Bench 6600, was established in 2016. The general configuration of the <br />South Quarry is shown in Fig. 4. <br />Mining in the South Quarry occurred between approximate elevation 6600 and 7360 above <br />MSL. The mining resulted in several temporary mine highwall configurations of <br />approximately 15 to 75 feet high with benches of 20 to greater than 50 feet wide. Mining in <br />2016 resulted in existing highwall expansion and highwall development, including the <br />establishment of a new, lower bench, Bench 6600. Upper sections of former haul roads were <br />developed into highwall benches and reclaimed benches. Total highwall height increased to a <br />total of 40 feet resulting from the new Bench 6600. <br />In addition, mine haul roads were modified to accommodate the revised highwall <br />configuration, resulting in new or modified haul road highwalls. The approximate areas <br />mined or disturbed in the South Quarry are shown in Fig. 4, 27, and 28. Fig. 5 through 23 <br />show the highwalls included in the scanline surveys conducted for the 2016 Geotechnical <br />Addendum.