Laserfiche WebLink
FULL BUILD OUT CONFIGURATION <br />Spillway Pond J <br />Determine flow velocity down 3h:1v embankment <br />AREA=(W*D)+(X*DA2)= <br />WETTED PERIMETER=(W)+2*[((X*D)A2+DA2)A0.5] <br />R=AREA/WETTED PERIMETER <br />V=(1 49/N)*(RA 667)*(SA.5)= <br />Q=AXV= <br />Q REQUIRED - Peak Discharge <br />Sediment Pond J <br />Riprap Sizing - Down Face of Embankment - Pond , <br />D50 = Size of Riprap <br />D50 = ((V X SA 17)/7 58))A2 <br />D50 = Diameter in feet <br />V = Velocity <br />S =Slope <br />D50 = 1 7 feet <br />Pond Dewatennc <br />FEET <br />FEET <br />EXPRESS AS DECIMAL <br />EXPRESS AS DECIMAL <br />SLOPE = X 1 <br />20 inches <br />POND J DEWATERING <br />USE A PUMP WITH A CAPACITY TO DEWATER IN 48 -HOURS <br />POND <br />Pond J Emergency Spillway <br />249 Acre -Feet <br />VOLUME <br />Manning's Equation <br />PUMP CAPACITY <br />281 GPM <br />Flow In a Trapezoidal Channe <br />DEPTH <br />D <br />0 500 <br />WIDTH <br />W <br />5 000 <br />Slope <br />S <br />0 330 <br />Mannings "N" <br />N <br />0.040 <br />SIDE SLOPE <br />X <br />2.000 <br />AREA=(W*D)+(X*DA2)= <br />WETTED PERIMETER=(W)+2*[((X*D)A2+DA2)A0.5] <br />R=AREA/WETTED PERIMETER <br />V=(1 49/N)*(RA 667)*(SA.5)= <br />Q=AXV= <br />Q REQUIRED - Peak Discharge <br />Sediment Pond J <br />Riprap Sizing - Down Face of Embankment - Pond , <br />D50 = Size of Riprap <br />D50 = ((V X SA 17)/7 58))A2 <br />D50 = Diameter in feet <br />V = Velocity <br />S =Slope <br />D50 = 1 7 feet <br />Pond Dewatennc <br />FEET <br />FEET <br />EXPRESS AS DECIMAL <br />EXPRESS AS DECIMAL <br />SLOPE = X 1 <br />20 inches <br />POND J DEWATERING <br />USE A PUMP WITH A CAPACITY TO DEWATER IN 48 -HOURS <br />3.00 FEET A2 <br />7.24 FEET <br />0.41 <br />1190 FT/SEC <br />3569 CFS <br />33.49 CFS <br />TR -105 Volume XI, App. B-6 09/15 <br />POND <br />RUNOFF FROM 10 -YEAR, 24-HOUR EVENT <br />249 Acre -Feet <br />VOLUME <br />809890 Gallons <br />PUMP CAPACITY <br />281 GPM <br />PUMP SIZE <br />4" <br />Dewatering Time <br />2880.00 Minutes <br />4800 Hours <br />200 Days <br />3.00 FEET A2 <br />7.24 FEET <br />0.41 <br />1190 FT/SEC <br />3569 CFS <br />33.49 CFS <br />TR -105 Volume XI, App. B-6 09/15 <br />