Laserfiche WebLink
FULL BUILD OUT CONFIGURATION <br />PEAK FLOW CALCULATIONS <br />The following peak flow calculations were compiled with the computer program SEDCAI <br />version 4 0 Details of the run-off calculations are shown on the following pages <br />10 -YR 25 -YR <br />24 HR 24 HR <br />Event Event <br />Pond J Drainage 2259 33.49 <br />Flow calculations for "J" ditches and culverts are presented in following sections of this exhibi <br />Spillway Pond J <br />Manning's Equation <br />Flow In a Trapezoidal Channe <br />DEPTH <br />D <br />0930 <br />FEET <br />WIDTH <br />W <br />5.000 <br />FEET <br />Slope <br />S <br />0 020 <br />EXPRESS AS DECIMAL <br />Mannings "N" <br />N <br />0 030 <br />EXPRESS AS DECIMAL <br />SIDE SLOPE <br />X <br />2000 <br />SLOPE = X 1 <br />AREA=(W*D)+(X*D2)= <br />WETTED PERIMETER=(W)+2'[((X'D)2+D2)1/2] <br />R=AREA/WETTED PERIMETER <br />V=(1 49/N )' (R") `(S' �2) = <br />Q=AXV= <br />Q REQUIRED - Peak Discharge <br />Spillway Pond J <br />Riprap Sizing - Across top of Embankmen <br />D50 = Size of Riprap <br />D50 = ((V X S^.17)/7 58))A2 <br />D50 = Diameter in feet <br />V = Velocity <br />S = Slope <br />D50 = 0 14 feet <br />1.7 inches <br />6.38 Feet2 <br />916 Feet <br />070 <br />5.52 Ft/Sec <br />35 21 CFS <br />3349 CFS <br />None Required <br />TR -105 Volume XI, App. B-5 09/15 <br />