Laserfiche WebLink
June 15, 2017 C-1982-057/Seneca II-W Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 7 <br /> <br />approximately 2 feet below the top of the riser. A small amount of initial erosion has begun around the pipe <br />and into the embankment. In order to ensure compliance and prevent damage to the embankment, this <br />riser pipe will require repair. Miranda Blomquist of Seneca Property stated that it is the intention of the <br />operator to attempt to place a sleeve over the pipe as access to the site with heavy equipment is difficult. <br /> <br />Pond 009 was stable and well vegetated at the time of the inspection. The pond was holding water with no <br />discharge noted at the time of the inspection. The pond embankments were stable with no problems noted to the <br />primary and emergency spillways. <br /> <br />Pond 016 embankments were stable and well vegetated. The pond was discharging at the time of the inspection. <br />No problems were noted with the primary or emergency spillways. <br /> <br />Pond 005 was holding water with a clear discharge. The embankments were stable with no problems noted. Two <br />salt blocks are on the north end of the embankment. <br /> <br />Pond 017 was discharging clear water at the time of the inspection. The pond embankments were stable with no <br />problems noted to the primary and emergency spillways. <br /> Pond 015 Pond 009 <br /> Pond 017 Pond 016