Laserfiche WebLink
Decree <br /> Case No. 04CW6 <br /> Table 5 N,Ionthly Operational Losses (acre-feet) <br /> Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total <br /> 1.57 1.57 1.57 1.81 1.81 1.81 1.81 1.81 1.81 1.57 1.57 1.57 20.28 <br /> 21. Total Losses from Evaporation and Mining Operations. The estimated total and <br /> monthly evaporation from 25 surface acres and operational losses associated with <br /> aggregate mining on the Kehn Property is set forth in Table 6 below. <br /> Table 6 Total Monthly Evaporation and Operational Losses (acre-feet) <br /> Jan Feb Mar Apr May June July I Aug Sept Oct Nov. Dec Total <br /> 3.57 3.82 4.32 6.81 7 81 11.06 11.56 11.31 8.31 5.82 3.82 3.32 1 81.53 <br /> The monthly lagged depletions from groundwater evaporation and operational <br /> losses associated with aggregate mining on the Kehn Property is set forth in Table 7 below. <br /> Table 7 Total Lagged Monthly Depletions from Evaporation and Operational Losses (acre- <br /> feet) <br /> Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Total <br /> 6.93 6.62 6.37 6.20 6.15 6.27 6.53 6.93 7.29 7.51 7,48 7.25 81.53 <br /> 22. Replacement of Depletions and Historical Return Flows. The Applicant shall <br /> measure and deliver on a daily basis 25 percent of the farm headgate deliveries <br /> attributable to the changed Water Rights directly to the Cache la Poudre River to <br /> replace historical surface return flows as described above. In addition,the <br /> Applicant shall measure and deliver on a daily basis 75 percent of the farm <br /> headgate deliveries attributable to the changed Water Rights to the Recharge Pit <br /> to meet the lagged subsurface return flow obligations and to replace the lagged <br /> evaporation and operational losses as shown in Table 7 in time,place and amount <br /> to prevent injury. <br /> 23, Recharge Operation and Accounting. The Applicant shall account for recharge <br /> accretions in accordance with the State Engineer's Office recharge protocol <br /> including the following. <br /> 23.1. Applicant shall prepare a stage-area capacity table for the Recharge Pit after <br /> it is constructed pursuant to paragraph 24 and install a staff gage in the <br /> Recharge Pit such that the gauge registers the lowest level in the Recharge <br /> Pit. The staff gauge must be readable from readily accessible location <br /> 8 <br />